Basement grouting waterproof plugging three major points of attention is not the key!
Author:Admin     Click:771     Time:2018-05-23 21:57:00

First, the key technology of grouting waterproof plugging in the basement

1, grouting as far as possible to fill the cracks, such as the complete closure of the crack, the other did not do waterproof will reduce the new damage.

2, to expand a certain waterproof area, will have been damaged parts of the water and may be damaged waterproof parts do not leak, reduce the repair after completion.

3. If the new project is completed, there will be a period of time when the main body of the building will be stable, and new cracks may still appear. Therefore, the scope of cracks may be expanded as much as possible during construction.

4. For concrete leakage, most of them are single or small or linear leaks. The drill bit shall be embedded in the way of grouting plugging. If complex situations have to consider a combination of multiple plugging methods.

5. For the leakage formed by broken cracks, construction joints, and post-pouring belts, the concrete can be plugged with grouting pipes or buried with water-proof needles. The plugging effect of the buried grouting pipe can be avoided. , It is better to embed the grouting waterstop needle.

6. For the seepage of settlement joints, most of them adopt the form of buried grouting pipes.

 

Second, the following preparations should be made before grouting:

1. Looking for cracks: For the water leakage at the leaking site, clean up the accumulated water and carefully look for cracks when the ground floor is cleaned. For dry substrates, clean the surface of the dust.

2. Drilling: According to the thickness of the concrete structure, the distance between the cracks is 150--350mm along both sides of the crack and the hole distance should be determined according to the actual situation on site. In most cases, there are 5-7 water-stopping needles per meter of cracks, and the cross section of the hole and the crack should be between 45 degrees and 60 degrees. The length of the water stop needle should be greater than half the thickness of the concrete.

3. Embedded water-stopping needles: The sealing-water needles are accessory parts. They are the connecting parts of the slurry injected into the cracks. When burying, the tools should be used to ensure that the rubber part of the needles will not slip out under high pressure.

4. The grouting pipe shall be buried with a V-shaped groove at the crack, cleaned with water in the tank, and the grouting pipe shall be used. The upper part of the grouting pipe shall be sealed with water without leakage, and then grouted into the grouting pipe. Normally, the buried pipe was cleaned on the day and the leak was blocked the next day.

Third, the grouting steps are as follows:

1. Pump pressure should be low when starting grouting and slowly increase the pressure until the slurry flows out.

2. During the grouting process, when it is observed that the grout completely replaces the leakage of water in the crack and overflows, it indicates that the grout has filled the crack sufficiently, and grouting from the grout can be terminated. Move to the adjacent grouting nozzle to continue grouting.

3, vertical cracks (including oblique joints) grouting should be performed from the bottom to the top; horizontal cracks (including nearly horizontal cracks) grouting should be carried out from the inside or from one end to the other.

4. After grouting in sequence, go back to the first grouting nozzle and inject it again.

5. After the grouting is completed, retain the grouting nozzle for more than 24 hours. If no grouting nozzle needs to be retained, the grouting nozzle may be cut or knocked off 24 hours after the end of the grouting.

6. After all the grouting is completed and the grouting material in the hole is solidified, the spilled grouting material shall be removed so that the base surface is clean and there is no wet or clear water.

7, cleaning grouting machine should be carried out immediately after the completion of the grouting, with special cleaning agent clear grouting equipment and tools.


Share : 
[ Print] [ Close]
熟妇人妻久久中文字幕无码美国少妇 | 无码人妻精品一区二区蜜桃网站 | 无码精品一区二区三区四区爱奇艺 | 无码人妻丰满熟妇区毛片樱花视频 | 国产亲妺妺乱A片 | 在线观看少妇内射手 | 午夜欧美精品久久久久久久久久 | 午夜精品久久久久久久爽懂色 | 黄色在线免费网站 | 久久日本片精品AAAAA国产 | 亚洲AV无码久久久久 | 黄片视频观看免费观看 | 99久久婷婷国产综合精品青桔 | 69人人妻人人澡人人爽国产DVD | 亚洲国产无码在线 | 色噜噜狠狠一区二区三区Av蜜芽 | 亚洲无码国产精品 | 女人和拘做受全程看免费软件 | 熟妇高潮一区二区在线播放 | 熟妇的味道HD中文字幕 | 熟妇~x88AV海角社区 | 无码一区二区三区视频在线观看播放 | 久久国产人妻午夜一区二区三区 | 一级a性色生活片久久毛片色欲av | 少妇性BBB搡BBB爽爽爽视頻 | 欧美日韩成人精品 | 色欲av无码一区二区人妻游戏 | 国产a一级久久久黄大片91MV | 亚洲凸凹仙踪林A片 | 欧美人与善交3D | 亚洲精品一区二区另类图片 | 国产AV无码网站 | 亚洲第一区在线观看 | 四川熟女操BBBBB操BBBBB | 国产精品秘 久久久久久免费 | xxxx69在线免费观看 | 一级二级三级黄片在线播放 | 国产偷人伦激情在线观看 | 91无码秘 一区二区三区 | 777午夜精品久久久 蜜芽青娱乐亚洲精品网 | 国产美女扒开小泬 |