Basement grouting waterproof plugging three major points of attention is not the key!
Author:Admin     Click:767     Time:2018-05-23 21:57:00

First, the key technology of grouting waterproof plugging in the basement

1, grouting as far as possible to fill the cracks, such as the complete closure of the crack, the other did not do waterproof will reduce the new damage.

2, to expand a certain waterproof area, will have been damaged parts of the water and may be damaged waterproof parts do not leak, reduce the repair after completion.

3. If the new project is completed, there will be a period of time when the main body of the building will be stable, and new cracks may still appear. Therefore, the scope of cracks may be expanded as much as possible during construction.

4. For concrete leakage, most of them are single or small or linear leaks. The drill bit shall be embedded in the way of grouting plugging. If complex situations have to consider a combination of multiple plugging methods.

5. For the leakage formed by broken cracks, construction joints, and post-pouring belts, the concrete can be plugged with grouting pipes or buried with water-proof needles. The plugging effect of the buried grouting pipe can be avoided. , It is better to embed the grouting waterstop needle.

6. For the seepage of settlement joints, most of them adopt the form of buried grouting pipes.

 

Second, the following preparations should be made before grouting:

1. Looking for cracks: For the water leakage at the leaking site, clean up the accumulated water and carefully look for cracks when the ground floor is cleaned. For dry substrates, clean the surface of the dust.

2. Drilling: According to the thickness of the concrete structure, the distance between the cracks is 150--350mm along both sides of the crack and the hole distance should be determined according to the actual situation on site. In most cases, there are 5-7 water-stopping needles per meter of cracks, and the cross section of the hole and the crack should be between 45 degrees and 60 degrees. The length of the water stop needle should be greater than half the thickness of the concrete.

3. Embedded water-stopping needles: The sealing-water needles are accessory parts. They are the connecting parts of the slurry injected into the cracks. When burying, the tools should be used to ensure that the rubber part of the needles will not slip out under high pressure.

4. The grouting pipe shall be buried with a V-shaped groove at the crack, cleaned with water in the tank, and the grouting pipe shall be used. The upper part of the grouting pipe shall be sealed with water without leakage, and then grouted into the grouting pipe. Normally, the buried pipe was cleaned on the day and the leak was blocked the next day.

Third, the grouting steps are as follows:

1. Pump pressure should be low when starting grouting and slowly increase the pressure until the slurry flows out.

2. During the grouting process, when it is observed that the grout completely replaces the leakage of water in the crack and overflows, it indicates that the grout has filled the crack sufficiently, and grouting from the grout can be terminated. Move to the adjacent grouting nozzle to continue grouting.

3, vertical cracks (including oblique joints) grouting should be performed from the bottom to the top; horizontal cracks (including nearly horizontal cracks) grouting should be carried out from the inside or from one end to the other.

4. After grouting in sequence, go back to the first grouting nozzle and inject it again.

5. After the grouting is completed, retain the grouting nozzle for more than 24 hours. If no grouting nozzle needs to be retained, the grouting nozzle may be cut or knocked off 24 hours after the end of the grouting.

6. After all the grouting is completed and the grouting material in the hole is solidified, the spilled grouting material shall be removed so that the base surface is clean and there is no wet or clear water.

7, cleaning grouting machine should be carried out immediately after the completion of the grouting, with special cleaning agent clear grouting equipment and tools.


Share : 
[ Print] [ Close]
国产一区二区在线浪潮 | 国产特一级大黄片大全 | 女人久久三级片网站 | 欧美乱大交XXXXX潮喷 | 国产免费A片在线观看不快色 | 国产不卡视频一区二区三区 | 婬乱A片欧美大片免费白浆 无码AV大香线蕉伊人少妇 | 免费无码婬片AAAA片上门服务 | 国产精品视频一区二区白丝喷水 | 国产蜜臀视频一区二区三区 | 中文字幕妇偷乱视频在线观 | 亚洲最大av在线 | 偷拍一区二区三区 | 肏中国老妇女视屏在线 | 丰满老熟妇BBBBB搡BBB | w w w .射| 亚洲一区二区三区在线视频 | 日韩免费黄色大片群交 | 久久久91人妻无码精品蜜桃hd69 | 黄色视频网址免费观看视频 | 近親相姦中文字幕A片 | 国产精品无码成人专区AV | 91jiuse人妻视频 | 国产免费A片在线观看不快色 | 亚洲精品一区二区久 | 人与兽黄色网址叉叉 | 日韩亚欧在线观看 | 亚洲精品成人动漫在线观看 | 女同精品一区二区三区 | 色噜噜狠狠一区二区三区Av蜜芽 | 久久久无码精品亚洲A片消消乐 | 狼人色色国产爱雨网一区二区久 | 国产成人一区二区三区AV影视 | 无码一区二区三区视频 | 中国一级片免费在线观看 | 欧美性猛交XXX乱大交3 | 成人无码区免费AⅤ片向日葵视频 | 亚洲精品国产精品国自产观看 | 毛片网站在线观看 | 爽灬爽灬爽灬毛少妇的性视频 | 爱妃视频一区在线观看 |